It is necessary for Zhongke Jufeng concrete mixer: Although there is an automatic metering device for the metering concrete mixer, the use of loader feeding cannot be ignored. Because the loader bucket is large, the batching bucket is small, and there is no baffle, sand and stone will be mixed in the loading process, resulting in inaccurate measurement, affecting the pumpability and strength grade of concrete, and easy to cause pipe blockage. The solution is to increase the ratio of cement to sand, which increases the cost. The mixing time of pumping concrete with double mixing technology shall not be less than 120 seconds. Necessary matters shall be carried out by machinery, but they can not be achieved in actual operation, which will reduce the workability and pumpability of concrete and easily block the pipeline. Pouring concrete is a kind of heterogeneous material. In practice, stone cutting points are often caused along the concentrated feed at a specific point, while cement mortar or floating mud in other areas are used to meet the design strength of concrete mixing and some areas, some of which do not reach the design strength, which solves the lack of strength and increases the amount of cement.
1.其他生产成本成本控制:在正确处理原材料账户和实际劳动力成本的基础上,项目部门的部门和相关人员,应当按照业务分工,及时、准确和完整的会计的具体生产过程所有的其他费用(包括:拌和厂设备的折旧摊销和维修、临时设施、设备的租金、水电费、混凝土质量检测费用等),并及时向财务部提交列示在当前混凝土生产成本中的发票和文件。后,控制混凝土搅拌电流不能处理和解或结算成本不足,相关的部门和人员负责根据合同和实际使用(程度的水和电或机械台班)费用应计提供的信息,并提交财务部在当前混凝土生产成本,确保生产成本会计的完整和准确。
1. Cost control of other production costs: Based on the correct handling of raw material accounts and actual labor costs, the departments and relevant personnel of the project department shall, according to the division of business, Timely, accurate and complete accounting of all other expenses in the specific production process (including: depreciation, amortization and maintenance of mixing plant equipment, temporary facilities, rental of equipment, water and electricity expenses, concrete quality inspection expenses, etc.), and timely submit invoices and documents listed in the current concrete production cost to the financial department. Finally, the control of concrete mixing current can not be settled or the settlement cost is insufficient. The relevant departments and personnel are responsible for providing the information according to the contract price and the actual use (degree of water and electricity or mechanical shift) cost accrual, and submitting it to the financial department in the current concrete production cost to ensure the integrity and accuracy of production cost accounting.
2.材料成本的准确控制:在江南app平台官网 车的会计期间(季度),项目部材料部应规定易于计量和发放的材料数量。遵循“什么时候使用,什么时候入账”的原则,应及时根据实际消耗的材料填写《材料清单》,在材料入账程序中录入一项支出。混合器的成本方法在季度末,根据库存方法的剩余材料。
2. Accurate control of material cost: during the accounting period (quarter) of the concrete mixer, the material Department of the project department shall specify the quantity of materials easy to measure and distribute. According to the principle of "when to use and when to record", fill in the material list according to the actual consumed materials in time, and enter an expense in the material entry procedure. The mixer cost method is at the end of the quarter, based on the inventory method of the remaining materials.
养护混凝土浇注后应及时养护。早期失水不仅阻碍了混凝土强度的正常增长,而且降低了混凝土的极限强度。因此,必须根据季节的变化,采取相应的措施保证温湿度,以满足混凝土强度增长的需求。
Curing concrete shall be cured in time after pouring. Early water loss not only hinders the normal growth of concrete strength, but also reduces the ultimate strength of concrete. Therefore, it is necessary to take corresponding measures to ensure the temperature and humidity according to the change of seasons to meet the demand of concrete strength growth.