1. When operating the concrete mixer truck, pay attention to the hydraulic system pressure in accordance with the provisions in the operation manual, and it is not allowed to adjust it at will. The quality and quantity of hydraulic oil should meet the original requirements.
2、工作时,不得将手伸入旋转的搅拌筒内,严禁将手伸入主卸料溜槽和加长卸料溜槽的连接部位,以免发生事故。
2. When working, do not put your hand into the rotating mixing drum, do not put your hand into the connection between the main discharge chute and the extended discharge chute, so as to avoid accidents.
3、操作江南app平台官网 车注意装料前,应先排净拌筒内残存的积水和杂物。在运输过程中要不停的转动,以防混凝土离析。混凝土搅拌运输车到达工地和卸料之前,应先使拌筒全速以14—18转/分转动1—2分钟,然后再进行反转卸料。反转之前,应使搅拌筒停稳不转。
3. Before loading the concrete mixer truck, the residual water and sundries in the mixing drum shall be drained. In the process of transportation, keep rotating to prevent concrete segregation. Before the concrete mixer truck arrives at the construction site and unloads, the mixing drum shall be rotated at full speed at 14-18 rpm for 1-2 minutes, and then reverse unloading shall be carried out. Before reversing, the mixing drum should be stopped.
4、冬期施工时,应切实做到:开机前检查是否结冰;下班时认真排除拌筒内及供水系统内残存积水,关闭水泵开关,将控制手柄置于“停止”位置。
4. During winter construction, it is necessary to check whether there is icing before starting the machine; when off duty, carefully remove the residual water in the mixing drum and water supply system, turn off the water pump switch, and put the control handle at the "stop" position.
5、在施工现场卸料完毕后,应立即用搅拌车随带的软管冲洗进料斗、出料斗、卸料溜槽等处,粘附在车身各处的污泥及混凝土。在返回搅拌站的途中,应向搅拌筒内注150---200L水以清洗筒壁及叶片粘结的混凝土残渣。
5. After unloading at the construction site, the inlet hopper, discharge hopper and discharge chute should be flushed with the hose attached to the mixer to remove the sludge and concrete adhering to the vehicle body. On the way back to the mixing station, 150-200l water should be injected into the mixing drum to clean the concrete residue bonded by the cylinder wall and blades.
6、搅拌筒内外积污及残存的混凝土渣块时,以及在机修人员进入筒内进行检修和焊补作业时,需先关闭汽车发动机,使搅拌筒完全停止转动。在机修人员进入筒内工作期间,必须保证拌筒内通风良好,空气新鲜,无可然气体及有害灰尘,氧气供应充足。在筒内使用电动工具操作时,操作人员必须有良好的绝缘保护。
6. When removing the dirt inside and outside the mixing drum and the remaining concrete slag, and when the machine maintenance personnel enter the cylinder for maintenance and welding repair, it is necessary to turn off the automobile engine to stop the mixing drum completely. During the period when the machine maintenance personnel enter the cylinder, they must ensure that the mixing drum is well ventilated, the air is fresh, there is no natural gas and harmful dust, and the oxygen supply is sufficient. When using electric tools in the cylinder, the operator must have good insulation protection.
7、应定期检查搅拌叶片磨损情况并及时进行修补和换新。
7. The abrasion of mixing blades should be checked regularly and repaired and replaced in time.
8、混凝土搅拌运输车司机必须经过培训,无合格证者不得上岗操作。
8. The driver of concrete mixer truck must receive professional training, and those without qualification certificate are not allowed to work.