注意细节是我们做事情要遵守的原则,驾驶
江南app平台官网 车更是如此,驾驶搅拌车需要做的细节事情:
Attention to details is a principle that we must follow when doing things, especially when driving a self loading concrete mixer truck. The details that need to be done when driving a mixer truck are as follows:
1、随车带上减水剂:减水剂是一种在维持混凝土坍落度不变的条件下,能减少拌合用水量的混凝土外加剂,随车携带,能对混凝土进行很好的调节。
1. Carrying water reducing agent with the vehicle: Water reducing agent is a concrete admixture that can reduce the amount of water used for mixing while maintaining the same slump of concrete. It can be carried with the vehicle and can effectively regulate the concrete.
2、回厂检查罐内水量:每次出车任务完成回到站内的时候,检查储水罐内的水量,让水罐中的水随时处于满罐的状态,以备不时之需。
2. Return to the factory to check the water volume in the tank: When returning to the station after completing the vehicle task, check the water volume in the water storage tank to ensure that the water in the tank is always in a full state, in case of emergency.
3、离厂前检查混凝土质量:可能会因为原料的不同,每一盘混凝土质量都会有变化。
3. Check the quality of concrete before leaving the factory: There may be changes in the quality of each plate of concrete due to different raw materials.
4、减少车辆行驶时间:混凝土运距一般在直径30千米范围以内,出车之前规划好路线以及车辆通行情况。
4. Reduce vehicle travel time: The concrete transportation distance is generally within a diameter of 30 kilometers, and the route and vehicle traffic conditions should be planned before departure.
5、减少损失先卸料:如果遇到人为因素或者不可抗因素,导致长时间无法卸料的情况,一旦发现混凝土开始凝结,在报备负搅拌责江南app平台官网 车防止粘罐的方法人之后立刻进行卸料,以防整个罐体报废。
5. Reduce losses and unload first: If human factors or uncontrollable factors are encountered, resulting in the inability to unload for a long time, once it is found that the concrete begins to solidify, the person responsible for mixing shall report the method of preventing sticking on the concrete mixing tank truck and immediately unload to prevent the entire tank from being scrapped.
卸料前让搅拌罐全速运转一两分钟。让混凝土充分搅拌,必要时可以加一些水,让混凝土搅拌得更均匀,也方便卸料。卸料不要大意和放料工打好关系。放料时尽量自己看着,免得放料工乱操作放料操作杆,每次罐子正反转中间位子时尽量停一下,保护减速机,托轮等。与放料工打好关系,卸料时也不要睡的太熟,万一工人闹情绪,把你车子放到工地不转罐子,造成闷罐就麻烦了。
Allow the mixing tank to run at full speed for one or two minutes before unloading. Allow the concrete to be thoroughly mixed, and if necessary, add some water to make the concrete mix more evenly and facilitate unloading. Do not have a careless relationship with the discharge worker when unloading. When discharging, try to watch as much as possible to prevent the discharge worker from operating the discharge lever recklessly. Every time the can is in the middle position of positive and negative rotation, try to stop as much as possible to protect the reducer, support wheel, etc. Establish a good relationship with the unloading worker, and do not sleep too soundly during unloading. In case the worker becomes emotional and leaves your car at the construction site without turning the can, it will cause trouble if the can becomes stuffy.
6、搅拌罐一定要仔细地冲洗干净。洗罐子时一定要仔细的冲洗干净,并把水反复的正反转两次,再放出来,然后一趟时把水箱的水全部放进罐子,再回到站加水清洗罐子。
6. The mixing tank must be carefully rinsed clean. When washing the can, it is necessary to carefully rinse it thoroughly and repeatedly turn the water forward and backward twice before releasing it. Then, in one pass, all the water from the water tank should be poured into the can and returned to the station to add water to clean the can.
以上是驾驶江南app平台官网 车一定要做的事情,而且细节问题要做好。更多相关事项就来我们网站
//www.scritchies.com咨询!
The above are the things that must be done when driving a self loading concrete mixing tank truck, and the details must be done well. For more related matters, come to our website //www.scritchies.com consulting service