自动上料搅拌车的主机多长时间就要清理一次?

来源://www.scritchies.com日期:2021-12-03 发布人:admin
自动上料搅拌车,是一种结合了混凝土运输车和混凝土搅拌站功能为一体,集混凝土装料、计量、搅拌、出料于一身,并可实现混凝土运输和现场混凝土施工作业的搅拌设备。那么自动上料搅拌车主机多久清理一次合适呢?
Automatic loading mixer is a mixing equipment that combines the functions of concrete truck and concrete mixing plant, integrates concrete loading, metering, mixing and discharging, and can realize concrete transportation and on-site concrete construction.
自动上料搅拌车的控制技术要求
Control technical requirements of automatic feeding mixer
1.各筒体,控制阀,电机按混凝土搅拌过程的要求运行,各筒体,控制阀,电机的控制准确,稳定,可靠。江南app官方网站下载安装苹果 厂家它可装运由搅拌厂生产的混凝土或按配比混合的骨料(砂、石子)、水泥和水,在运输过程中,不断对湿料慢慢搅拌,防止混凝土在运输过程中初凝和离析。
1. Each cylinder, control valve and motor operate according to the requirements of concrete mixing process. The control of each cylinder, control valve and motor is accurate, stable and reliable. From the manufacturer of the loading concrete mixer truck, it can ship the concrete produced by the mixing plant (station) or the aggregate (sand, stone), cement and water mixed according to the proportion. During the transportation, the wet material is continuously mixed slowly to prevent the initial setting and segregation of the concrete during the transportation.
控制系统有自动和手动两种工作方式,它们相互独立,相互制约。
The control system has two working modes: automatic and manual, which are independent and restrict each other.
2.系统发展具有一个良好的抗干扰能力和完善的报警自保护管理功能;
2. The system development has a good anti-interference ability and perfect alarm self-protection management function;
3.通过与计算机通讯,可以进行显示信息系统管理工作状态、故障报警;
3. Through communication with the computer, it can display the working status and fault alarm of information system management;
它的主机多久清洗一次合适呢?
How often is it appropriate to clean its host?
一个工作周期内搅拌车主机系统少应清洗1次。每天可以生产活动结束后,则应对搅拌车主机信息进行比较的清洗,方法是:在清洗服务过程中,将水及少许石子放进搅拌主机内通过搅拌5~10min,清洗后将机内物料管理全部清洁完,不得有积水、积料;停机后再冲洗以及管道,清洁完搅拌罐内外环境灰尘和粘附的混凝土。一般这种情况下,搅拌设备主机之间加水约150~180kg左右,其他产品型号选择主机可据此分析增减,也可自备高压水枪或者进行数据清理。
The mixer truck host system shall be cleaned at least once in a working cycle. After the production activities are finished every day, the main engine of the mixer truck shall be cleaned by comparing the information. The method is: during the cleaning service, put water and a little stone into the mixing main engine and mix for 5 ~ 10min. After cleaning, all the material management in the machine shall be cleaned without water and material accumulation; After shutdown, wash the and pipes, and clean the dust and adhered concrete inside and outside the mixing tank. Generally, in this case, about 150 ~ 180kg water is added between the main machines of JS1000 mixing equipment. The main machines of other product models can analyze the increase or decrease according to this, or provide their own high-pressure water gun or clean the data.
在冲洗搅拌主机料门时,应避免上部冲洗下的积料形成异物卡滞料门现象。搅拌过程中,若混凝土运输车较长时间没有到位(超过20~30min,尤其在夏季),应加水对搅拌机进行简易清洗。
When flushing the material door of the mixing machine, avoid the accumulation of material under the upper flushing to form the phenomenon of foreign matter blocking the material door. During mixing, if the concrete truck is not in place for a long time (more than 20 ~ 30min, especially in summer), add water to simply clean the mixer.
搅拌车设备正常生产期间,要定期检查搅拌筒内及搅拌轴上混凝土的凝固情况,如有凝结应及时按要求进行人工铲除。人工清理搅拌筒前,切断电源、气路,放净余气、锁好控制室;人工清理搅拌筒时,严禁猛烈敲击搅拌轴、搅拌臂及搅拌叶片。
During the normal production of mixer truck equipment, the solidification of concrete in the mixing drum and on the mixing shaft shall be checked regularly. If there is condensation, it shall be removed manually in time as required. Before manually cleaning the mixing drum, cut off the power supply and gas circuit, discharge the residual gas and lock the control room; When manually cleaning the mixing drum, it is strictly prohibited to knock the mixing shaft, mixing arm and mixing blade violently.
自动上料搅拌机用冲洗充电门,上部冲洗避免夹在充电门的现象形成的异物积累的材料时的搅拌主机设备。混合过程中,如果不再有在现浇混凝土卡车(超过20-30分钟,尤其是夏天),水应加入搅拌机,便于清洗。
The automatic feeding mixer is used to flush the charging door, and the upper part is used to flush the mixing host equipment to avoid the accumulation of foreign materials caused by the phenomenon of being caught in the charging door. During the mixing process, if there are no more trucks in the cast-in-situ concrete (more than 20-30 minutes, especially in summer), the water shall be added to the mixer for easy cleaning.
以上就是 自动上料混凝土搅拌罐车//www.scritchies.com为大家介绍的内容,感谢您在百忙之中查看我公司的信息内容,如果您想要了解的更多,欢迎您来电进行咨询!
The above is the automatic feeding concrete mixing tank truck //www.scritchies.com Thank you for checking the information of our company in your busy schedule. If you want to know more, you are welcome to call for consultation!